Monday, 19 November 2012
Newsflash!
So the build has been going extremely well! We are at the stage where next week the roof will be being put in place. There have been a few hiccups on the way with things being delivered etc. but, dad's amazing planning and years of preparation made sure that these delays were only small hiccups. The builders have had to take a few days off due to bad weather stopping them from being able to get on with what they needed to do, however that hasn't stopped them pushing forward. On Saturday of last week the builders came in the morning to finish off work they weren't able to do on the Friday.
Only the floor panels to go
So that's it all of the second floor joists are put into place, the floor panels have to be put into place, the wall at the back built up a bit more and then the roof can go on!
Second floor fitted
The second floor is being put into place,
windows have been delivered,
and we are ahead of schedule.
Sunday, 11 November 2012
Building Structure
First Floor and the building structure
Above: Master Bedroom
Above: Master bedroom
Above: Gallery, Landing
Above: Bedroom 2 and hall
Above: Bedroom 3, Hall and Bedroom 2