The walls are building up really quickly now. I am extremely excited and can suddenly picture what its going to look like!
Sunday, 16 September 2012
Insulation causing a traffic jam
Well as the picture below shows the delivery of the insulation blocked up the whole street. Which didn't seem to go down too well with people on their way back from work.
Well the delivery of the insulation went smoothly until the middle wheel went straight through the man hole cover and left remains in the drain.
Sunday, 9 September 2012
Stone hardcore compaction and another delivery
The pictures below show stone hardcore being levelled out and compacted before being blinded by sand.
The pictures below show the delivery of the blocks ready to build the walls.
The pictures below have been taken by the builders to show the building inspector the build up of the ground floor construction.
Outer borders being filled in
The pictures above show my adorable brother and one of the builders Paul moving some soil to fill in the outer border of the foundations.
Big delivery
The pictures below show the huge lorry that payed us a visit on day eight with another delivery.
The picture above above and below show the lorry blocking the light from out kitchen.
Subscribe to: